Muscat: The Ministry of Transport has opened a new part of the dual carriageway project, the Barka-Nakhl Road
In a statement, the Ministry said, "Opening a new part of the dual carriageway project in Barka-Nakhl Road, 8 km long, for traffic, which is a continuation of the previously opened section with a length of 14 km, bringing the total of the opened part to 22 km out of 38 km, the total length of the road."